BSNL outages and service status in Bāli, West Bengal
Problems detected
Users are reporting problems related to: internet, phone and total blackout.
- BSNL generated 0 outage signals in the last 24 hours around Bāli, including 0 direct reports.
- The most common problems reported in this area mention Total Blackout, Phone, and Internet.
- The most recent signal from this area was received Aug 18, 1:47 AM GMT+5:30.
- Total Blackout (50%)
- Phone (41%)
- Internet (9%)
Bharat Sanchar Nigam Limited (abbreviated BSNL) offers mobile and fixed communications, including both dial-up and broadband internet, phone service, mobile phone and mobile internet, as well as television over internet (IPTV). Mobile phone service is offered under the BSNL Mobile brand.
Problems in the last 24 hours in Bāli, West Bengal
The chart below shows the number of BSNL reports we have received in the last 24 hours from users in Bāli, West Bengal and surrounding areas. An outage is declared when the number of reports exceeds the baseline, represented by the red line.
August 20: Problems at BSNL
BSNL is having issues since 09:10 AM IST. Are you also affected? Leave a message in the comments section!
Live Outage Map Near Bāli, West Bengal
The most recent BSNL outage reports came from the following cities: Kolkata.
| City | Problem Type | Report Time |
|---|---|---|
|
|
Phone | 3 days ago |
|
|
Phone | 3 days ago |
|
|
Internet | 4 days ago |
|
|
Phone | 6 days ago |
|
|
Phone | 6 days ago |
|
|
Phone | 6 days ago |
Nearby cities with recent reports
8 recent signals
Community Discussion
Tips? Frustrations? Share them here. Useful comments include a description of the problem, city and postal code.
Beware of "support numbers" or "recovery" accounts that might be posted below. Make sure to report and downvote those comments. Avoid posting your personal information.
BSNL Issues Reports Near Bāli, West Bengal
Latest outage, problems and issue reports in Bāli and nearby locations:
-
S R (@SayantanRaha6) reported from Kolkata, West Bengal@CMDBSNL Hello sir, My father is retired employee of BSNL. Our landline is O.O.O from 2020 and we registered many complaints but no response from the team. I checked the status of complaints, it shows resolved. I tweeted and get the same response. Would be grt if U can help.
-
Soumyaditya Nath Sharma (@NathSoumyaditya) reported from Hāora, West Bengal@BSNL_KOTD @k1k1m2 Suffering from bad GSM service in BSNL very bad 3G network and my data is working as 0.9 mbps. Call drop problem PH- +919432400194 & +9194324 00249 Kolkata circle District- Howrah Address-14/8 Nandalal chatterjee lane belepole pin-711104 @BSNLCorporate
-
Dr. Chiranjeev Lakshman (@clakshman87) reported from Kolkata, West BengalHello @BSNL_KOTD. I want to discontinue the Broadband services on my BSNL landline number 033 2421**** Customer care says I have to visit the exchange and submit a physical application. During pandemic, can't I do the same online?
-
Sankar Chakraborty (@Sankar_I_Am) reported from Kolkata, West BengalStill now can't able to send text to that number i.e. 56161600 provided by @AxisBank to receive my customer id.Plz do some needful as because I need to send a prescribed text on that number from my registered number & I really don't want to leave BSNL for this reason. @BSNL_KOTD
-
Mr. Brajesh Kedia (@brajesh_kedia) reported from Hāora, West Bengal@amazon @JeffBezos @BSNLCorporate Can you guys sort the issue yourself that why we can't recharge BSNL numbers on Amazon??
-
sudipto Das (@dassudiptoasl) reported from Kolkata, West Bengal@BSNLLiVE3G I am a BSNL customer West Bengal circle, What is tariff to increase validation. Outgoing already suspended.
-
GAUTAM SINHA RAY (@goutamobc) reported from Hāora, West Bengal@SBICard_Connect In the trailing mail 29/04 of Customer Care it is confirmed that “ Card is active”. Today morning I used card to pay BSNL but transaction was declined & Card is blocked. So that there is no coordination internally in SBI card and Customers are being harassed
-
Soumyaditya Nath Sharma (@NathSoumyaditya) reported from Hāora, West Bengal@JioCare When I am facing problem I dam my details to your official Twitter but on that time your jio care can't reply me so I already port my jio SIM to BSNL and also stop using your jio fibre and I shipped to BSNL ftth. @BSNLCorporate GSM & ftth service are very good wonderful service
-
Subhajit Chatterjee (@Subhaji78801939) reported from Kolkata, West Bengal@BSNL_KOTD @BSNLCorporate @BSNL my FTTH down for 2 days now, I am not able to work for 2 days. Tried all option but still no luck. Not sure why do you guys even exist wasting people money doing nothing.
-
Ravi Menon (@RaviMen48172263) reported from Kolkata, West Bengal@BSNLCorporate Today a fraud had called me at my land line number saying he is calling from Bsnl Customer care and asked me to download QS from play store on my mobile I got saved luckily. Pls trace this guy down I am bringing this to your notice.
-
-
Arup Halder (@ArupratanHalder) reported from Bārāsat, West BengalLast 12 hours my BSNL mobile network doesn't work. My local pin code 743334(west bengal) Please sir do something @BSNLCorporate @BSNL_KOTD
-
Aditya (@AdityaKOLKATA) reported from Kolkata, West Bengal@BSNL_KOTour office line 033-22487811 is not working since May 2020 .complain done several time but no action taken but routinely every month we are paying the bill since May 2020. It is surprising BSNL doesn't revert to complain lodged on phone, via letter and also email.
-
Shadab Ahmed (@rational_folk) reported from Hāora, West Bengal@RajeshS72141064 @BSNL_HR Modi era is the reason for crippling BSNL. In Manmohan era BSNL was the first to introduce cutting edge 3G network in India. In Modi era it still doesn't have 4G.
-
sushil mishra (@sandhan147) reported from Kolkata, West Bengal@MobiKwikSWAT I have just recharged no 9432846569 amt 118 BSNL. Amount debited from account but no not recharged. Please help.
-
Diptadip Mandal (@diptadip_mandal) reported from Hāora, West Bengal@FirhadHakim @udmawb Rishra Municipality Chairman on behalf of Local Cable Operator stopped bsnl services in Rishra area. All the emergency services police station fire station service cannot be done.
-
Ravi Menon (@RaviMen48172263) reported from Kolkata, West Bengal@BSNLCorporate @DoT_India Finally my problem has been attended to yesterday from Bsnl, hope my line will work now undistrupted for some days . Thank you for the support 🙏.
-
Atanu Sengupta (@senatanu66) reported from Kolkata, West Bengal@BSNL_KOTD 03325421089 gone dead down since 14th May. No idea how to make it alive again.This landline is solely for broadband usage.Hence do not find much reason to keep this line any more due to Pathetic services of BSNL technical team. Docket no 16120965782.Pls do the needful.
-
Soumyaditya Nath Sharma (@NathSoumyaditya) reported from Hāora, West Bengal@BSNLCorporate I suggest BSNL as a customer please lunch official soft client app of BSNL for customer comfort and satisfaction thank you.
-
Sadananda Patra (@SadanandaPatra) reported from Hāora, West Bengal@DICEIANS @ImVAmishra @boxervijender Because BSNL infrastructure is further behind and poor quality, they don't have money to upgrade thier infrastructure, that's why. If they have 4G still they will not delivered good connection at all
BSNL Issues Reports
Latest outage, problems and issue reports in social media:
-
the boi 🐂💸 (@boidawonda) reportedalright boys, got a bunch of requests on it so wanted to do a *mega* tweet on the data center build out with my research so here goes, the indian data centre stack, listed names only, 60-odd companies, one pass through the whole thing long one, grab a coffee OPERATORS -- who actually has live mw e2e networks: 5,100+ gpus live, in-house tir and jarvislabs platforms, q1 fy27 ebitda margin 75.2%. the one operator where the margin is right there in the filing (ebitda though, the capex and d&a bill is the other half of that story) nxtra (bharti airtel): ~150 mw live, mgmt talking a path to 1 gw over 3-4 yrs adaniconnex (adani ent): 65.4 mw operational, 960+ mw *******, a 400 mw hyperscale order on the books l&t vyoma: 26 mw operational, a 36 mw ai-ready build at mahape scalable to 100 mw, sells colo + sovereign cloud + gpu/cpu compute techno electric: chennai 36 mw live, noida and kolkata in development, plus a 102-site edge network anant raj: operating dc capacity + cloud/iaas disclosed, and an expansion plan far bigger than what's live tcs hypervault: multi-year openai partnership, initial 100 mw with an option to 1 gw, tpg funded. nil turnover through 31 dec 2025. biggest programme in the set and it is pre-revenue public sector: railtel has two edge dcs done and a 10 mw noida build with the first 5 mw expected shortly. powergrid runs a 400g backbone and is building a 1,000-rack govt dc pilot at manesar. delaplex has a class 4 micro-dc design, a hyderabad pilot, a pan-india bsnl-site rollout and a 3-yr psu-bank contract context only: hcltech's odisha sovereign ai park is an mou with a ₹14,257 cr planned outlay. reliance carries dc ops inside its digital business with nothing broken out outside e2e, nobody breaks out dc utilisation or segment margin. planned mw is a headline, not a p&l *the boi's favorite pick here: e2e* SERVERS + STORAGE -- what goes in the rack netweb: designs and builds ai systems, hpc, private cloud, servers and storage in india. ai systems were 62.29% of q1 revenue esconet (hexadata): ai servers, gpu workstations, storage, hpc. 6,000+ servers/workstations installed, ~28 pb of storage out there. q1 fy27 ebitda margin 8.55%, now pitching a sovereign stack panache digilife: ai servers for edu/smb/dc plus dr/dc capability. q1 fy27 operating ebitda margin 10.2%, dc revenue not separated dynacons: dc/cloud systems integrator, calls it a core growth engine. integration is a crowded room black box is here as an integrator, it doesn't own the server ip. redington and rashi are distribution. selling boxes is not building them order books prove demand. none of these disclose product-level margin, so pricing power here is a guess *the boi's favorite pick here: bbox* FIBRE + NETWORK -- more gpus, more east-west traffic sterlite tech: >₹500 cr of dc portfolio orders in q3 fy26, first commercial g.654.e order, neuralis for ai white-space and dci, india-first hollow-core fibre cable, multi-core fibre, 780+ patents, glass to assembly in-house hfcl: usd 51.98m / ₹495.80 cr export order for optical-fibre-cable dc connectivity, due by dec 2026. mgmt says the interconnect mix should earn above blended margin tata comm: izo dc dynamic, on-demand dci up to 100g across 44 dcs on five continents, own subsea footprint, consumption-based pricing black box: end-to-end network infra for hyperscaler ai-campus builds, large direct programmes, low blended ebitda tejas, d-link: enterprise networking, no ai-dc order located orders and patents are direct. how many vendors each hyperscaler has qualified, and what the dc segment earns, nobody discloses *the boi's favorite pick here: stltech* POWER TO THE FENCE -- grid, gensets, transformers, green ppas cummins india: data centres were 30-35% of domestic power-gen revenue in fy26. mgmt says pricing largely held after cpcb iv+, low-end competition persists kirloskar oil engines: hypernext programme, 192 mw, 96 units of 2,500 kva optiprime dual core gensets, expressly for an ai hyperscale dc powerica: hhp dca-approved gensets with install/epc scope bolted on, multiple colo and hyperscaler projects done, dc was 12% of its cummins business in fy26, 9-12 months of work visibility hitachi energy india: dc named as a new segment for capacity expansion, ~15% of dc capex addressable per mgmt, 12-15 month transformer lead times, price-variation clauses in the contracts cg power: ~₹900 cr / usd 99.2m of power transformers for a us dc project (tallgrass), deliverable over 12-20 months siemens energy india: grid connection in india plus exports into us dc transformer applications ge vernova t&d: 400/765 kv kit, mgmt says current dc backlog is insignificant and should become meaningful kec: first 400 kv transmission line to power a data centre, western india, buried inside a ₹1,180 cr package so the dc value is not broken out bajel: ₹300+ cr gis substation order for a dc customer, 400/220/33 kv, single-digit blended ebitda cleanmax: 5.7 gw operational + contracted renewables, ai/dc ~42% of contracted volumes, stt partnership >130 mw across dc hubs, new ppas plus a 21 mwp solar add ntpc green: mous with ctrls (up to 2 gw) and nxtra (up to 500 mw). mous are not ppas taril, shilchar, voltamp, td power: hot transformer cycle, zero dc-specific order located. a hot cycle is not dc linkage order value is disclosed. margin, escalation, cash terms are not, for basically every one of these *the boi's favorite pick here: powerindia and gvt&d* POWER INSIDE THE BUILDING -- switchgear, pdus, ups vivid electromech: data centres ₹99.94 cr = 49.95% of fy26 operating revenue, software-integrated pdus made in-house, mgmt cites 5-6 of the top-ten operators as customers and a 45-50% win rate abb india: dc ~12-13% of order book, band 12-16%, full mv/lv/ups/pdu/automation stack schneider electric infra: dc transformer orders plus high-volume relay and retrofit orders aimtron: usd 12m custom ups programme, six skus, 1/2/3 kv variants, made at vadodara, for a fortune 500 ohio dc player marine electricals: ₹75.19 cr of orders from stt and princeton digital group for power distribution, 12-18 month execution, lv/mv, busduct, automation, ibms. competes with schneider, abb, eaton, l&t, siemens kei, polycab: cables go into dcs, no dc segment disclosed. prostarm: ups/power quality, materiality unresolved product owners and installers land in the same tenders here. blended margin is the only tell anyone files *the boi's favorite pick here: vivid* COOLING -- where the heat goes aeroflex: 9,000 liquid-cooling skids disclosed, target 15,000 by q3 fy27, 16 products in r&d, plus the fluid-transfer hoses/assemblies going into those skids krn heat exchanger: data centres ~18.7% of q4 revenue, order booking called strong. fin-and-tube heat exchangers for chillers and dry coolers today, adding microchannel, developing cdu plate heat exchangers blue star: says it is working on dc liquid cooling, no scaled commercial programme located thermax: a dc cooling/energy opportunity won or under development, size and timing not quantified voltas: hvac scale, no dc-specific cooling revenue located dc-specific cooling margin: disclosed by nobody. skid counts and revenue share are the hard numbers rn *the boi's favorite pick here: not listed (iykyk)* BUILDERS -- civil, mep, prefab, commissioning black box: hyperscaler ai-campus builds, large backlog, 9.3% q1 ebitda margin aurionpro: repeat global hyperscaler order close to ₹100 cr for an ai-ready dc in navi mumbai, build plus project management, mechanical through fit-out in one scope techno electric: owner-operator that also does the power epc epack prefab: 4-5 dc projects, repeat orders, an adani dc order, dc ~4-5% of order book. rockwool panels, envelope, peb cemindia (ex itd cementation): dc construction incl mep listed as a business activity, no project values attributed sathlokhar: aerohub data centre under construction, value undisclosed konstelec: bidding on a few dc projects, mgmt calls it exploration and flags margin pressure. no order yet l&t builds its own campuses. lloyds engineering/siscol has a historical dc portfolio with nothing current attributed the builders who do print a margin sit in single digits to low teens. order flow proves demand. who keeps the money is a different filing *the boi's favorite pick here: bbox* PRECISION PARTS -- the small stuff inside the big stuff mtar: ₹35 cr first-article export order for ai-dc assemblies, ~70% value addition per mgmt, described as profitable, "steep learning curve". first article is not serial production yet thermax: >₹400 cr of boiler pressure parts for a us data-centre project, sits in industrial products aeroflex again, for the fluid-transfer assemblies inside liquid-cooling skids *the boi's favorite pick here: aeroflex* whether any of these becomes a repeat serial line is the whole question. none of the filings answer it yet so, what's actually filed: live mw at half a dozen operators, one visible 75% margin, five orders between ₹300 cr and ₹900 cr, a few names where dc is already a fifth to two-thirds of a revenue line, a lot of first orders, a lot of mous what isn't filed: dc segment margins, almost anywhere in the stack i have views on which slice of this keeps the money. those stay in the journal not advice, dyor. i'm more wrong than i am right
-
Hazel🖤 (@DammnGirll) reported@RealR4bbit BSNL is that bad?
-
Deepal Patel (@DeepalPatel1) reported@BSNLCorporate i have made several complaints online and at the bsnl office but seems like you dont want us to have a landline. Kindly resolve it or never ask for payment as i am not going to pay
-
Sneakysen (@sneaky_sen) reported@JioCare your network is getting wrose day by day. Complaint raised,no action taken. Planning to switch other network. BSNL is far better than you in my area. in the name of unlimited 5g you are doing a scam. It switches automatically to 4g.
-
BSNLCare (@bsnl_care) reported@mahesh_world7 Dear Sir, We sincerely apologize for the inconvenience caused. We understand your concern regarding the “Not Found” / service not available error while trying to book a BSNL SIM online for PIN code 444404. Online KYC availability does not necessarily mean that SIM delivery is currently available at every PIN code, as delivery depends on local service and logistics feasibility. We request you to kindly visit your nearest BSNL CSC/authorised retailer to check SIM availability at your location. Regards, BSNL Care (Shatrughan)
-
Praveen (@Kamble1Praveen) reportedBSNL network Reliable network
-
Shubh Mandal (@shubhmandal) reported@JM_Scindia @BSNLCorporate @CMDBSNL My father's phone with BSNL sim is lost and customer care is asking for last 3 called numbers to block the Sim. This sim is connected to all banking channels and not used for calling so he does not know last called numbers. PLEASE HELP!!!!!
-
Naksh Raj Bhati (@Nakshbhati1) reported@TRAI Please update #BSNL #5G SERVICE . BHARAT NEED #BSNL BEST SERVER
-
BSNLCare (@bsnl_care) reported@Jass__bhathal Dear Customer, Greetings of the day! We acknowledge your concern and are working on a resolution. Your complaint has been escalated, and you can expect a response shortly. Your complaint number is H1912194308462 . Regards, BSNL-Care (Neha)
-
OnlineNewsPortal.In Online News Portal (@onlinenewsporta) reportedMobile Recharge Prices May Rise 12–15% in Next 3–4 Months; Jio, Airtel and Vi Users Could Face Higher Bills Millions of mobile users in India could soon have to pay more for their monthly recharges. A fresh industry assessment suggests that telecom tariffs may rise by around 12–15% over the next three to four months, putting another strain on household budgets. The projection comes from Centrum Institutional Research, which said the telecom industry's pricing environment has become more favourable for operators following consolidation in the sector. The report expects another 12–15% tariff increase as companies seek to improve average revenue per user (ARPU). The potential increase would affect the country's major private telecom operators, including Reliance Jio, Bharti Airtel and Vodafone Idea (Vi). However, it is important to note that the 12–15% figure is an analyst expectation, not an officially announced tariff increase by all three companies. The possibility of a hike has gained further attention after Airtel recently restructured its prepaid portfolio. The company withdrew several plans, including the popular ₹299 recharge, along with ₹579, ₹619 and ₹649 options. For some Airtel customers, the impact is already visible even without a formal across-the-board tariff hike. The withdrawal of the ₹299 plan means users seeking a comparable 28-day unlimited daily-data option may have to move to a costlier plan. Analysts estimate that the effective impact of Airtel's recent portfolio rationalisation could be around 3–4% overall, while some individual users face a much larger increase depending on the plan they previously used. The bigger question is whether Jio and Vi will follow Airtel with a much broader increase. Industry analysts believe the probability has increased because India's telecom market has effectively consolidated around three major private operators, alongside BSNL. The last major industry-wide tariff increase came in July 2024. Since then, operators have focused on improving monetisation through changes to plans, data benefits and customer segmentation. The expectation now is that another significant hike could help telecom companies raise revenue without relying entirely on subscriber growth. Rising data consumption is another important factor. Millions of customers have moved from basic 4G services towards higher-value data usage and 5G services. Telecom companies need to recover the substantial cost of network expansion and 5G investments, making higher ARPU increasingly important. Vodafone Idea is under particularly strong pressure to improve its financial position and generate sufficient cash for network investment. The company has outlined a large multi-year revival plan, while recent financial results showed its ARPU rising to ₹177 and its subscriber base reaching about 193.1 million. Jio, meanwhile, appears to be preparing its customers for a changing pricing environment in another way. The company has reportedly brought back Jio Prime with a one-year price-guarantee feature, allowing eligible users to protect their tariff rates for a year. The move comes immediately after Airtel's latest restructuring of its prepaid plans. If a 12–15% increase is eventually implemented, the impact could be significant for regular prepaid users. A ₹299 plan, for example, would theoretically become about ₹335–₹344 after a 12–15% increase, while a ₹599 plan could move to roughly ₹671–₹689. Actual prices would depend on how each operator restructures its plans and whether benefits are changed at the same time. The increase could be even more noticeable for annual and long-validity plans because customers generally pay a larger amount at one time. At the same time, operators could choose to redesign plans rather than simply increase every recharge price by the same percentage. For consumers, the immediate takeaway is that a 12–15% hike should currently be treated as an industry forecast rather than a confirmed nationwide price increase. No final tariff schedule covering all Jio, Airtel and Vi plans has been officially announced on the basis of the analyst projection. But the direction of the market is becoming clearer. Airtel's recent plan withdrawals, expectations of higher ARPU and the industry's need to recover network investment costs are all strengthening the case for another tariff cycle. If Jio, Airtel and Vi ultimately move together, mobile connectivity could become noticeably more expensive for Indian households before the end of 2026. The next major trigger will be whether operators convert the current analyst expectations into actual tariff revisions—and whether the three companies make their moves simultaneously or one operator breaks first.